Can you ask for half up front on a home job? The deposit limits in California, NSW, Victoria and Queensland
Asking for half up front covers the materials before you start. On a home job that California, New South Wales or Queensland law covers, it's also over the legal cap. Victoria's cap is similar, but it doesn't reach a contract for only one listed type of work, such as plumbing or electrical work.
The short version
- California: a down payment on a home improvement contract can't be more than US$1,000 or 10% of the contract price, whichever is less. On a small repair the customer called you about, if it meets the "service and repair" conditions (including a $750 limit), you can't take any payment until the work is done.
- New South Wales: a deposit for residential building work can't be more than 10%. Plumbing and drainage (other than roof plumbing), gasfitting and electrical wiring done on a home count as residential building work, whatever the price.
- Victoria: 10% under A$20,000 and 5% from A$20,000, under a domestic building contract. Under the current regulations, a contract for only one listed trade, such as electrical work or plumbing work, is outside that Act.
- Queensland: above A$3,300, 10% under A$20,000 and 5% from A$20,000 (20% when more than half the work by value is done off site).
- These are limits, not amounts you have to charge, and they're about direct contracts with homeowners (in California, tenants too), with exceptions in each law. Subcontracts and commercial work sit under different rules.
Take a hypothetical $8,000 job to re-pipe a bathroom for a homeowner, quoted on a template that asks for half up front. That's $4,000 before you start. In California, NSW and Queensland the most you can ask for is $800. In Victoria the answer depends on whether the contract is for plumbing alone. This note sets the four rules side by side, then covers what counts as a deposit, where plumbing and electrical jobs fit in each place, how each law lets you get paid for materials once the job is under way, and how we'd set up a quote template so the deposit line is checked before the quote goes out.
The four limits side by side
Each limit is written into a statute, and each applies to a contract with the owner (or, in California, also a tenant) for work on a home. Here's how they treat three hypothetical jobs. The prices are made up, are in US dollars for California and Australian dollars elsewhere, include any sales tax or GST, and assume a licensed contractor dealing directly with the homeowner. The figures are ceilings: other conditions can still stop you taking a deposit at all, such as the NSW rule, covered below, that a job needing home building insurance can't take one until the customer has the certificate.
| Hypothetical job | California | NSW | Victoria | Queensland |
|---|---|---|---|---|
| $600 leak repair the homeowner called about | No payment until it's fixed, if it meets the service and repair conditions | $60 (10%) | No cap under the Act if the contract is plumbing only | No statutory maximum at $3,300 or less; the QBCC recommends no more than 20% |
| $8,000 bathroom re-pipe | $800 | $800, and the contract must be in writing | No cap under the Act if plumbing only; $800 if it's part of a wider renovation contract | $800 |
| $30,000 kitchen renovation, plumbing and wiring included | $1,000 | $3,000 | $1,500 (5%) | $1,500 (5%) |
The bottom row is where the four part ways. California's $1,000 doesn't grow with the job, so on anything over $10,000 the most you can take stays at $1,000 (unless you hold the bond described below). NSW keeps 10% at every size. Victoria and Queensland step down to 5% as the job gets bigger, which is the opposite of what a contractor buying more materials might expect.
What counts as a deposit
The table only works if you know which payments it covers. Each law restricts what you take before the work starts, though they word it differently.
- NSW calls it "a payment on account before work is commenced under a contract to do residential building work".
- Queensland counts "any payment for domestic building work" demanded or received before the work starts at the building site, and gives a home warranty insurance premium as an example. Work done off site, in a workshop, doesn't count as starting.
- Victoria limits the deposit a builder demands or receives "before starting any work under the contract".
- California uses "downpayment" without defining it, and limits every payment after it as well (more on that below).
So calling a payment under the same contract a "materials fee", "booking fee" or "mobilisation charge" doesn't take it outside the cap, at least under the NSW and Queensland wording, if it's paid before work begins. What the payment is for decides it, not its name. And in all four places the limit is on what you ask for and what you take. NSW also makes it an offence to sign a contract that entitles you to more.
California: $1,000, and nothing up front on a small call-out
Section 7159.5 of the Business and Professions Code covers every home improvement contract between a licensed contractor and an owner or tenant. "Home improvement" means repairing, remodeling, altering, converting or modernizing residential property, so a plumbing or electrical job at a house is inside it. The down payment can't exceed $1,000 or 10% of the contract amount, whichever is less, and the same section requires the contract to be in writing. Section 7159 adds detailed contents for contracts over $500, and requires the contract to print, in its "Downpayment" section: "THE DOWNPAYMENT MAY NOT EXCEED $1,000 OR 10 PERCENT OF THE CONTRACT PRICE, WHICHEVER IS LESS."
The call-out work most plumbers and electricians do can fall under a different rule. Section 7159.10 defines a "service and repair contract": $750 or less, the customer contacted you to ask for the work, and you don't sell them goods or services beyond what the problem needs. One more condition is part of the definition: "No payment is due, or accepted by the contractor, until the work is completed." A $600 leak repair that fits those terms is paid when the work is completed, which the section defines as the problem fully corrected and, where it applies, the building department's acceptance of the work. If you present a contract as a service and repair contract and it doesn't meet all of the conditions, the full home improvement contract requirements apply instead, whatever the price.
Taking too much is a misdemeanor under section 7159.5(b), with a fine of $100 to $5,000, up to a year in county jail, or both. A contractor that furnishes a performance and payment bond, a lien and completion bond, or a bond equivalent or joint control approved by the registrar, covering full performance and payment, is exempt from the down payment limit and the progress payment rules. That's a formal arrangement with the Contractors State License Board, not something a quote can claim.
These are California's rules. Other US states write their own, and we haven't read them for this note. If you work outside California, your state's contractor licensing board is the place to check.
New South Wales: 10%, and plumbing counts
California has a dollar cap. NSW has none, and in one respect its rule reaches further. Section 8 of the Home Building Act 1989 sets the maximum deposit for residential building work at 10% of the contract price. The definition of residential building work, in Schedule 1, includes "specialist work done in connection with a dwelling", and specialist work means plumbing and drainage work other than roof plumbing, gasfitting, electrical wiring work and some air-conditioning and refrigeration work. (Roof plumbing on a home is included separately.)
There's a $5,000 floor in that definition, but it says "other than specialist work". So a small handyman job, or a small roof plumbing job, can fall outside the Act while a $600 plumbing repair inside a house stays in it, and the 10% applies.
Section 8 has two exceptions. It doesn't apply to a contract between two licence holders for work both licences cover, which the Act's note says includes a subcontract between licensees. And it doesn't apply to specialist work that isn't also residential building work, such as plumbing in a shop.
Two thresholds sit beside the deposit rule, both GST inclusive. Over $5,000, the contract must be in writing, dated, signed, and show your licence name and number, a description of the work and the price. Over $20,000, the full contract requirements apply, and progress payments are only allowed in forms section 8A authorises (more on those below), except where the Security of Payment Act applies to the contract. Over $20,000 the work also generally needs home building compensation cover, and NSW Government guidance says it's illegal to ask for a deposit or other payment until that cover is in place and the customer has the certificate. The maximum penalty for an excess deposit is 1,000 penalty units for a corporation and 200 for anyone else. The Home Building Regulation 2014 also lets a home building insurance contract exclude the part of a deposit above the section 8 limit.
Victoria: the cap that skips plumbing-only and electrical-only jobs
Under section 11 of Victoria's Domestic Building Contracts Act 1995, a builder must not demand or receive a deposit of more than 10% of a contract price under $20,000, or 5% of a price of $20,000 or more, before starting work. It applies to all domestic building contracts, whatever the size. If a builder breaks it, the owner may avoid the contract at any time before it's finished, unless VCAT considers that unfair in the circumstances, and a court can order a refund on top of the penalty.
The difference from NSW is in the regulations. Regulation 7 of the Domestic Building Contracts Regulations 2017 lists types of work that are not building work under the Act "if the work is to be carried out under a contract for only that type of work". The list includes electrical work, plumbing work (as defined in the Building Act 1993), tiling, painting, plastering, glazing and floor coverings. An electrician rewiring a house under a contract for that alone is outside the Act, and so is section 11. If the electrician's contract with the owner also covers other building work, it's inside. (Working on a renovation site doesn't change the electrician's own contract: a subcontract with the builder is excluded from the Act's definition of a domestic building contract, and an electrical-only contract with the owner stays outside.)
The exclusion is in force today. What the text can't tell you is what comes next: the regulations are due to sunset on April 12, 2027, and the replacement regulations may change the list. Other law, including the Australian Consumer Law, still applies to an electrician's or plumber's contract outside the Act. If your quotes rely on the exclusion, we'd check the new regulations when they're made, and Consumer Affairs Victoria or the Building and Plumbing Commission (which took over from the VBA in 2025) can answer questions about a particular contract.
Queensland: 10% or 5%, above $3,300
Queensland's rule is in Schedule 1B, section 33, of the Queensland Building and Construction Commission Act 1991. For a "regulated contract", a domestic building contract with a price over $3,300, the deposit can't exceed 10% of the price under $20,000 (a level 1 contract), or 5% at $20,000 or more (level 2). If more than half the contract's value is off-site work, such as a custom kitchen built in a workshop, the limit is 20%. The maximum penalty is 100 penalty units.
Domestic building work in Schedule 1B includes the repair of a home and, for a renovation or repair, "the provision of services or facilities" to it, with lighting, water supply, sewerage and drainage given as examples. We found no exclusion for plumbing-only or electrical-only contracts like Victoria's.
At $3,300 or less the contract isn't regulated, and section 33 doesn't apply. The QBCC's news page on deposits says "Projects up to $3,300: Maximum deposit is 20%". Its guide for owners and contractors is more exact: the legislation "does not stipulate maximum deposits for these smaller building projects", and the QBCC recommends owners never pay more than 20% before work starts. We'd keep small-job deposits within that 20%.
Where the materials money comes from instead
A big deposit is often about materials, such as a hot water system or switchboard bought before the job starts. The caps don't take that cost away, and each law has its own rule for what you can bill once the job is under way.
- California lets you schedule progress payments in the contract, in dollars and cents, tied to work or materials. You can't request or accept a payment that exceeds "the value of the work performed or material delivered". A progress payment due when the hot water system is delivered to the house fits that wording.
- NSW, on contracts over $20,000, authorises progress payments due after a stage described in plain language, or, where the contract provides for it, for labour and materials "in respect of work already performed or costs already incurred", backed by invoices or receipts. Section 8A doesn't apply where the Security of Payment Act covers the contract.
- Queensland requires any claim other than the deposit to be directly related to the progress of the work at the building site and proportionate to the value of that work. On that wording, we wouldn't bill for materials just because they've been delivered.
- Victoria, in section 40, sets stage percentages for major domestic building contracts (over $10,000) to build a home. For a major contract that isn't one of those types, such as a renovation, a builder must not demand or receive any amount "not directly related to the progress of the building work". The parties can agree to depart from this only in the way the regulations set out: a warning in Form 1 signed by the owner and a clause in Form 2 signed by both, before the contract is signed.
So the second payment depends on where you are. California allows one when the materials are delivered, up to their value. NSW, over $20,000, allows one after a stated stage or for costs already incurred, if the contract provides for it. Queensland, and Victoria on major contracts, tie it to progress on the work itself, such as a finished rough-in, valued at what that stage is worth.
How we'd set up the quote
All of this ends up as one line on a quote. A template that says "50% deposit required" can be reused for every job until someone checks it. If we were writing quotes overnight for a trade business, this is how we'd set them up:
- One quote template per place you work, with the deposit and payment terms you've approved for that place, worked out from the quoted price, not typed in by hand.
- A note on each job of what kind it is: homeowner or another contractor, home or commercial, and in Victoria whether the contract is your trade alone or part of a wider renovation. That's the information that decides which rule applies, and it's usually in the first message from the customer.
- In California, small call-outs flagged. If a job could be a service and repair contract, the quote asks for no deposit and the invoice goes out when the work is done.
- Progress payments written into the quote for anything with expensive materials, with the delivery or stage that triggers each one, chosen to fit the rules where the job is.
- Anything that doesn't fit the template flagged for you, not guessed: a job that crosses a threshold after a variation, a customer who wants to pay more up front, a mixed contract in Victoria, a job big enough to need insurance. Which rule applies, and what you charge, stay your decisions, and every quote waits for your OK.
Done that way, the deposit line gets checked when the quote is drafted, not when a customer reads it. Back to the $8,000 re-pipe in California: the quote would ask for $800 up front, a progress payment when the pipe and fittings are delivered, no more than their value, and the rest on completion. In Queensland, the second payment would come at a stage of the work, valued at what that stage is worth. Either way, each payment follows a delivery or a finished stage the law in that place recognises, and $4,000 doesn't change hands before the work starts.
Want help keeping quotes up to date?
Writing up quotes from your price list is part of what Taiwan Rep's overnight office does. See what we handle and what stays with you. Pricing and contract terms stay with you.
Get startedThis note summarises deposit rules for work for homeowners in California, New South Wales, Victoria and Queensland as we read them on October 28, 2026. It isn't legal advice. Other states and territories, commercial work and subcontracts have their own rules, and a contract that's close to a threshold or mixes kinds of work is worth checking with your licensing body or a lawyer.
Sources
- California Business and Professions Code section 7159.5: the $1,000 or 10% down payment limit, payments not exceeding work performed or material delivered, the bond exemption, misdemeanor penalties
- Section 7159: the $500 threshold for home improvement contract requirements and the required "Downpayment" notice; with section 7151 and section 7151.2 for the definitions
- Section 7159.10: service and repair contracts, the $750 limit and no payment until the work is completed
- Home Building Act 1989 (NSW): section 8 (maximum deposit and exceptions), sections 7 and 7AAA (written contracts), section 8A (progress payments), Schedule 1 clause 2 and the Dictionary (residential building work, specialist work)
- Home Building Regulation 2014 (NSW): the $5,000 and $20,000 thresholds, and the insurance exclusion for deposits above the section 8 limit
- Domestic Building Contracts Act 1995 (Vic), authorised version 094 as at July 1, 2026: sections 3, 5, 6, 11 and 40
- Domestic Building Contracts Regulations 2017 (Vic), authorised version 004 as at July 1, 2021, the version in force: regulation 6 (the $10,000 major contract amount), regulation 7 (single-trade contracts), regulation 13 and Forms 1 and 2, and the April 12, 2027 sunset date
- Queensland Building and Construction Commission Act 1991: Schedule 1B sections 1, 4 to 7, 33 and 34
- Queensland Building and Construction Commission Regulation 2018: section 45 (the $20,000 level 2 amount)
- Understanding deposits and progress payments, QBCC, last reviewed September 23, 2025: the 20% figure for projects up to $3,300; and the QBCC's guide to domestic building contracts for owners and contractors, section 11: no statutory maximum at $3,300 or less, and the 20% recommendation
- Contracts, NSW Government: no deposit or other payment before home building compensation cover is in place and the certificate is given